Welcome to Eureka's Website!...

Structural Framework
Manufactured from aluminium alloy AIMgSi Group 6060T6. A wide range of extrusions available to safely span commercial pools in width and practically any length.

External Finish
Powered polyester-coated by electrostatic multi-layered spraying to give a smooth appearance in up to 180 RAL colours.

Roofing
250 times stronger than glass. LEXAN® THERMOCLEAR® DRIPGUARD® Manufactured by General Electric Plastics in a double wall cellular structure to ensure minimum loss of natural heat gained during the day. 6mm thickness gives optimum co-efficient for temperature increase due to the greenhouse effect. It is treated to reduce the formation of water droplets due to condensation and also treated against the suns UVA rays to help keep your swimming pool free from any heavy growth of algae or mould. LEXAN® is virtually unbreakable.

Side Walls
Crystal clear tough Polymethyl Methacrylate (PLEXIGLASS) is much safer than any other form of glazing and easy to maintain.

Weatherproofing
Antistatic Synthetic fibre sealing brushes used throughout the building keep out the wind, dust, leaves, snow and rain to give you a nice indoor feeling.

Rollers, Guides and Joining elements
To enable easy, smooth opening and closing, a no-track /rail free system is used, leaving nothing to trip on when the building is opened up.

Each section of the building is connected to the next one by a patented system of counter gliding fitted inside the bottom rails and once again stainless steel is used for longevity.

Temporary fixing to the ground
is achieved with stainless steel quick release fixations, requiring minimum effort to attach and detach whenever necessary.

Back ends of buildings
Normally fixed but can be removable in 1 to 5 pieces, for example when stacking direction is reversed (from large to small).

Front ends of buildings
Can be removable in 1 to 5 pieces but normally is a tiltable front panel, counterbalanced (like an up and over garage door) allowing the whole building to be opened back without obstruction.

Foundations
Eureka Telescopic Pool buildings are made to a very large structural safety margin, but do not require deep foundations. The existing pool patio usually suffices (provided it is relatively smooth), but ideally a 10cm concrete base enables the winterising tie down bolts to be properly anchored. We can suggest during the site visit if some ground work is advisable.

Building Controls
Our buildings comply with Building Regulations for planning purposes, in respect of wind and snow loading and also fire resistance of the roof.

Planning Permission (not normally required)
Eureka Telescopic Pool Buildings satisfy the permitted development rules but our Directors can advise if planning permission is necessary and if required will offer our services in submitting a planning application to the local authority and gaining approval.

New swimming pools to be built
Eureka liase with good quality swimming pool builders throughout the UK and Ireland to ensure the smooth progress for planning, designing, building and finishing of your complete pool and telescopic building project.

Terms of business
Should the building not be required for several months, a 10% initial payment is required to progress your order and freeze the price. 40% payment in total is needed some 6 weeks prior to the required installation date. The 60% balance is then due on installation.

 

About Us | Directors | Stand Alone | End On | Lean to | Centre Opening | Low | Custom Build | Hotels | Schools
Camping Sites | Leisure Centres | Climabri | Motors | Testimonials | FAQ | 12 Stages | News | Contact Us | Enquiry Form